| SKU: | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Availability: | |||||||||
| Quantity: | |||||||||
| As an all-in-one safety working facility tailored to high-rise facade projects, this self-lifting attached scaffold relies on electric synchronous drive to move the whole frame after being fastened to building main structures. | |||||||||
The Automatic Climbing Attached Scaffold System is an integrated safety working platform customized for facade construction of super high-rise buildings. Fixed on building beams, columns and shear walls, it is equipped with synchronous electric lifting units to realize stable lifting, lowering and accurate positioning of the frame.
Compared with ground and cantilever scaffolding, this platform only needs one-time assembly on the ground floor and can climb automatically along with building floors, eliminating frequent assembly and disassembly of steel pipes. The whole frame adopts a fully enclosed three-dimensional protective structure with mechanical and intelligent operation, which outperforms traditional scaffolds in safety standards, construction efficiency and site tidiness. Suitable for prefabricated buildings, commercial towers and old building renovation projects, it covers all exterior wall construction procedures and serves as core equipment for cost reduction and quality improvement in eco-friendly standardized super high-rise construction.
Item | Standard Parameters |
Main Frame Material | Welded from hot-dip galvanized high-strength square steel, overall rust and corrosion resistance |
Lifting System | Electric synchronous lifting unit + integrated intelligent control cabinet, supports one-key integral lifting/lowering and independent fine-tuning of single spans |
Attachment & Fixation | Through-wall attached supports, anti-fall devices, positioning and load relief |
Protection Structure | Double-layer enclosure composed of steel mesh and flame-retardant safety net, capable of dust suppression, falling debris prevention and resistance to construction impact |
Anti-fall Configuration | Automatic anti-fall device, anti-overturning device, limit alarm |
Lifting Speed | Uniform and stable lifting, synchronous operation on floors |
Applicable Buildings | High-rises, super high-rises, prefabricated buildings, shear wall structures and buildings with irregular facades |
Recyclable Usage | Reusable for multiple projects, easy to assemble and disassemble |
Dual Protection System Ensures High-Altitude Safety
The linkage of mechanical structures and intelligent electric control provides multi-layer protection. The enclosed steel barrier blocks falling objects from heights, allowing smooth passage of all safety supervision inspections.
Automatic Climbing Shortens Construction Period
One-time assembly enables automatic climbing throughout construction without occupying tower crane resources. Interior and exterior wall construction can proceed simultaneously to accelerate project delivery.
Greatly Reduced Long-Term Construction Costs
Massive procurement of steel pipes and couplers is unnecessary, cutting labor costs for high-altitude assembly and disassembly. The reusable equipment delivers prominent cost advantages for large-scale residential projects.
Enclosed Construction Builds Eco-Friendly & Standardized Job Sites
It suppresses construction dust and noise, keeps construction sites neat and orderly, and meets evaluation standards for dust control and green construction sites.
Modular Design Fits Diverse Architectural Shapes
Flexible splicing adapts to bay windows, connecting corridors and irregular walls. Excellent wind resistance allows continuous exterior wall construction in rainy and windy weather.
Simple Operation & Low Maintenance Cost
The integrated electric control console is easy to operate by a single worker. The equipment runs with low failure rates, saving time and labor on daily maintenance.
• Ground Scaffolding:It requires a huge quantity of consumables, consumes much labor on layer-by-layer assembly and disassembly, brings high risks for high-altitude work, occupies large site space and generates continuous consumable loss that pushes up overall costs
• Cantilever scaffolding: Complicated layered assembly and disassembly leads to high labor costs. Steel pipes suffer severe wear from repeated use, and frequent high-altitude operations bring numerous potential safety hazards
• Automatic Climbing Attached Scaffold System: It only requires one-time ground-floor assembly for automatic lifting, features fully enclosed intelligent protection and can be recycled repeatedly, making it the optimal all-round solution for super high-rise facade construction
Applicable to super high-rise residential buildings, resettlement housing, office buildings, industrial parks, old town renovation and prefabricated structures.
It matches all exterior wall construction works, including steel bar binding, concrete pouring, masonry, plastering, thermal insulation & coating and curtain wall installation.
Guangdong Corto Technology Co., Ltd. is a high-tech enterprise located in Guangzhou, the core city of the Guangdong-Hong Kong-Macao Greater Bay Area. We specialize in the design and manufacturing of new formwork for mid-rise buildings, high-rise climbing frame systems, high-rise climbing formwork systems, light and heavy building machines and other related products. Boasting leading R&D and design capabilities, sophisticated production techniques and a rigorous quality control system, our products have been widely applied in numerous key projects across the country, including super high-rise landmarks and large-scale commercial complexes. Representative projects include KK100 in Shenzhen, Tianjin CTF Finance Centre, Guangzhou West Tower, Chongqing Vanke Land & Sea International Center, Xi'an Silk Road International Center and Chengdu China Overseas Tianfu Center. Our product quality and on-site performance have earned high recognition from the industry and general contractors.
Guangdong Corto Technology Co., Ltd. is a high-tech enterprise located in Guangzhou, the core city of the Guangdong-Hong Kong-Macao Greater Bay Area. We specialize in the design and manufacturing of new formwork for mid-rise buildings, high-rise climbing frame systems, high-rise climbing formwork systems, light and heavy building machines and other related products. Boasting leading R&D and design capabilities, sophisticated production techniques and a rigorous quality control system, our products have been widely applied in numerous key projects across the country, including super high-rise landmarks and large-scale commercial complexes. Representative projects include KK100 in Shenzhen, Tianjin CTF Finance Centre, Guangzhou West Tower, Chongqing Vanke Land & Sea International Center, Xi'an Silk Road International Center and Chengdu China Overseas Tianfu Center. Our product quality and on-site performance have earned high recognition from the industry and general contractors.
Guangdong Corto Technology Co., Ltd. is a high-tech enterprise located in Guangzhou, the core city of the Guangdong-Hong Kong-Macao Greater Bay Area. We specialize in the design and manufacturing of new formwork for mid-rise buildings, high-rise climbing frame systems, high-rise climbing formwork systems, light and heavy building machines and other related products. Boasting leading R&D and design capabilities, sophisticated production techniques and a rigorous quality control system, our products have been widely applied in numerous key projects across the country, including super high-rise landmarks and large-scale commercial complexes. Representative projects include KK100 in Shenzhen, Tianjin CTF Finance Centre, Guangzhou West Tower, Chongqing Vanke Land & Sea International Center, Xi'an Silk Road International Center and Chengdu China Overseas Tianfu Center. Our product quality and on-site performance have earned high recognition from the industry and general contractors.
Guangdong Corto Technology Co., Ltd. is a high-tech enterprise located in Guangzhou, the core city of the Guangdong-Hong Kong-Macao Greater Bay Area. We specialize in the design and manufacturing of new formwork for mid-rise buildings, high-rise climbing frame systems, high-rise climbing formwork systems, light and heavy building machines and other related products. Boasting leading R&D and design capabilities, sophisticated production techniques and a rigorous quality control system, our products have been widely applied in numerous key projects across the country, including super high-rise landmarks and large-scale commercial complexes. Representative projects include KK100 in Shenzhen, Tianjin CTF Finance Centre, Guangzhou West Tower, Chongqing Vanke Land & Sea International Center, Xi'an Silk Road International Center and Chengdu China Overseas Tianfu Center. Our product quality and on-site performance have earned high recognition from the industry and general contractors.